How long does structural drying actually take?
Usually within three to five days for a typical room or two, once extraction is done. Saturated wall cavities, hardwood over a crawl space, and large multi-room losses sit at the longer end. Daily moisture checks track progress room by room, and equipment comes out as soon as readings verify dry — not on a fixed schedule.

